Scope
Project management, controls, supervision, trades, and equipment to support the Greenfield construction of a new 3.4km trunkline connecting the Honeymoon processing plant with a new well field.

Installation of pipework and associated fittings from Honeymoon to East Kalkaroo

      • BLS ~3.4km OD630 Co-Ex PN16 x 20m Length

      • PLS ~3.4km OD630 Co-Ex PN10 x 20m Length

      • Flushing Water ~6.8km OD225 Co-Ex PN10 x 20m Length (2 separate lines)

      • Shower Water ~3.4km OD90 Co-Ex PN16 x 100m Coil.

     

    BLS line will be from 4 new pumps installed next to the BLS Pond to a predetermined manifold location at East Kalkaroo. PLS line will be from a pre-determined manifold location at East Kalkaroo to the PLS Pond. Flushing & Shower Water lines will run from tie-in points on the existing system located just North of the process plant.